Upper Ohau River Sediment Removal
Environmental earthworks project for Meridian Energy to clear silt and sediment impacting Lake Ruataniwha.

SERVICES
Earthworks Environmental
Location
Lake Ruataniwha
Status
Completed
Works Description
A sensitive aquatic earthworks operation involving the excavation and removal of accumulated silt and sediment from the Upper Ohau River. The project required strict environmental controls and water management protocols to protect the downstream ecology of Lake Ruataniwha.
Sediment Excavation
Large-scale removal of silt and gravel deposits from the river system.
Environmental Protection
Implementation of rigorous turbidity and sediment controls to protect aquatic life.
Heavy Plant Operations
Deployment of specialized excavators and articulated dump trucks in challenging riverbed conditions.







