Projects & Tenders

_N5N0578 - Version 2We have completed a vast range of projects, ranging into the millions of dollars, for a number of high-profile clients. We have the people, plant and systems to either complete large site-works jobs as head contractor or work as a major subcontractor to national contractors on large projects.

Our safety, quality, project management and financial systems assist us in both tendering and contract management requirements.

We have the people, structures and systems to complete multi-million dollar tenders with schedules. These can be either measure and value or lump sum in nature. We are conversant with both lowest-price conforming and attribute-weighted tenders.

Our experience covers bulk earthworks through subdivision and supermarket site-works to full road constructions including underground services and associated ancillary items. We work as well in urban or rural environments, understanding the different risk profiles of each.

Notable Projects

Notable projects include the clearing of State Highway One and emergency works on State Highway 70 following the Kaikoura Earthquakes, Fonterra Clandeboye Tanker Park, Tekapo Town Centre Stage 2 Subdivision, Hagley Oval (for the 2015 Cricket World Cup), Halswell New World, Rangiora Pak ‘n’ Save, Wainoni Pak ‘n’ Save, Darfield Subdivison and the Mainfreight Terminal in Christchurch; road construction and drainage on the NZTA South Canterbury Maintenance Contract (for a seven year duration); road construction and drainage of Kilmore Street as part of the Canterbury rebuild in Christchurch; road construction and drainage on the NZTA Coplands Road contract near Ashburton; earthworks on Kiwirail Bridge 105 at Otaio; earthworks at the Port of Timaru for the new Holcim silo; earthworks on the Bus Interchange, Grand Central and Ministry of Justice sites in Christchurch and site-works for the Meridian building and the Medical Centre in Twizel.

We also work on a number of Council roading and drainage contracts; complete foundation and drainage work on building sites; have completed a number of large irrigation pond constructions and track maintenance contracts; and work on Blakey Pacific’s forestry tracks around South Canterbury.

Outstanding Results

Our company has a strong commitment to developing and maintaining long term relationships with our existing and potential clients. Management and staff take pride in producing high quality and well managed work on every project. The list below shows our commitment to achieving outstanding results:

  • All projects are completed to the highest quality and to relevant regulations and standards.
  • Detailed programmes to ensure projects are finished on time.
  • Health and Safety management is fundamental to our practices. Illustrating our commitment to this is our ACC WSMP Tertiary Accreditation.
  • Cost tracking technology that ensures projects run to budget.
  • All staff are fully trained and are always encouraged to improve.
  • All plant and equipment is presented in a professional image and modern.
  • Protection of the environment forms an important part of project planning.