North St 33kV Cable & Fibre Optic Cable Duct Installation - Alpine Energy Limited
 
This contract is for the trenching, cable and duct installation, backfilling, reinstatement of a trench through 6 km of the residential heart of Timaru, South Canterbury.
The work involved the trenching, cable and ducting installation, backfilling, reinstatement of a 6,000m trench through the residential heart of Timaru. 
Paul Smith Earthmoving has had to work closely with local service providers for the protection of existing assets and have embarked on a large media campaign to keep local residents fully informed. Finished quality is of high importance with the TDC having final sign off
 
 
TNZ 62002 - Transit New Zealand Recycled Crushed Concrete Contract - Christchurch
TNZ 62002 - Transit New Zealand Recycled Crushed Concrete Contract - Christchurch
 
Initial siteworks for this project included the establishment of a stockpile site at Wigram, Christchurch for the production and supply of 60,000 cubic metres of recycled crushed concrete AP65 subbase for use on the subbase construction of the proposed Christchurch Southern Motorway extension.  This contract started in September 2008 and is still current
 