North St 33kV Cable & Fibre Optic Cable Duct Installation - Alpine Energy Limited
 
This contract is for the trenching, cable and duct installation, backfilling, reinstatement of a trench through 6 km of the residential heart of Timaru, South Canterbury.
The work involved the trenching, cable and ducting installation, backfilling, reinstatement of a 6,000m trench through the residential heart of Timaru. 
Paul Smith Earthmoving has had to work closely with local service providers for the protection of existing assets and have embarked on a large media campaign to keep local residents fully informed. Finished quality is of high importance with the TDC having final sign off
 
 
Previous | Next